Question:
The IIL Board seeks a high level analysis and recommendations for the IT solution. It is assumed at the outset that the current IIL Risk Analysis Product (RAP) application will provide the necessary functional processing services. The applications impact analysis will be a separate project. RAP is hosted on the current virtualised in-house platform in the IIL data centre. The solution must define a single platform to support a large volume of primary and generated data sourced from existing in-house and cloud platforms.
Storage Requirements
Key factors:
Highly sensitive competitive and personal private data
Very large volumes
Restricted number of users
Restricted report distribution
Episodic localised workday access only
Limited performance expectation
Capacity Data:
Estimated database size 100TB growing at between 50% to 100% pa
Service extension for 2017 for new Location Intelligence initiatives will double
capacity and raise growth tp between 75% tp 150% pa
Data retention is 5yrs for personal data, 10yrs for vehicle data, and 20yrs for home data.
Platform Security:
The highest level of storage security is provided in-house for policy data and customer information. This data has a higher level of security requirement. Archived data is at the same security level as other archived customer and business data.
Access Security:
Less than 10 nominated users on desktop devices within HQ.
RAP application is the only API required.
Deliverables in Project A Preliminary Statement of Work
a one-paragraph Problem Statement,
a list of the stakeholders the group wishes to speak with, and
an overview of each group member’s Area(s) of Responsibility
Extended Statement of Work
a comprehensive Problem Statement (with formal Stakeholder Assent),
descriptions of the tools and methodology,
a requirements specification,
test criteria to demonstrate compliance with relevant standards, and
a project management plan.
Answer:
Introduction
Inshore Insuranc Ltd (IIL) has planned for modifying their storage system and the following report would help in realizing the benefits of upgrading the information storage system for the organization. The benefit realization plan would be helpful for easing the evaluation of the processes for forming the identification of the reasons for the implication of improved storage system for IIL.
Scope and Context of Project
The project would involve the improvement of the information system storage of IIL for easing their information and providing them with the scope for the improvement of the operations. The project would also involve the successful formation and development of the factors aligning the significant utilization of the factors of operations. The project would involve the use of the improved storage for increasing the performance speed of the project. The improved system would help in increasing the autonomy, influence, simplified operations, and skills of the organization.
Value Proposition
Alignment with Value Guidelines
The new storage information system would be helpful for aligning with the structure of Val IT Framework and ISO 38500. As per the structure by isaca.org (2018), the new structure of IT framework involve the implication of cyber security for the data storage system. The CSX has been designed for improving the industries for aligning the safety and security framework for the data stored in an information system. The IIL would get the benefit of improved cyber security functions for the information storage.
Development Compliance
The project governance for the project of information system upgrading of IIL would be developed based on the incremental allowances of the project development. The compliance development for the project would be based on the following points,
Project steering committee would be in charge of the project quality and acceptance criteria
Project Manager would take care of the activities and align the successful completion process
Project team members would execute the activities and works for the project
Operational Compliance
The information storage developed for IIL would be evaluated on the following standards,
Integration of the information storage for IIL so that data redundancy can be dealt
Securing the information from external access or modification alignment
Increasing the performance pace of the IIL with the help of automation process
Benefit/Risk/Cost Model
The identified benefits of improved information system are integration of information, security of the data, and performance increment. The impact of these benefits over the risk and costs are given below,
Benefits
Impact on Risk
Impact on Cost
Integration of information
Reduce the probability of the risk like data redundancy, data overwrite, and loss of data
Reduce the cost of managing the data on separate platform
Security of data
Reduce the probability of the risk like data theft and data manipulation
Restrict the expense/loss due to data theft
Performance Increment
Reduce the probability of the risk like slower operations and delay in completion of sales operations
Cost lost due to delay in operations would be minimized
Value of Compliance
The implication of the compliance for the project of information system development for IIL would help in,
Ensuring all operations would be executed successfully
Each of the project member would be responsible for their corresponding activities
No confusion would arise resulting in completion of the project as expected
Non-Compliance
The probable issues of non-compliance for the project of information system development for IIL are,
Data redundancy and data overwrite
Loss of data
Data theft and data manipulation
Slower operations and delay in completion of sales operations
Benefit Profiles
Integration of information
Benefit Title: Integration of information
Unique Number:
001
Benefit Owner:
Data manager
Benefit Overview:
Data would be integrated on a single platform
Current business problems:
data redundancy, data overwrite, and loss of data
Solution:
Single Big Data Platform
Enabling functionality
Integrated Data Source
Change required
Business, Technology, Organisation, People and Process
Big Data Solution should be installed
Impact on risk and cost
Reduce the probability of the risk like data redundancy, data overwrite, and loss of data
Reduce the cost of managing the data on separate platform
Business case variation
IIL would be able to store their data on a singe platform
How will this be measured, source of information and frequency
Data Storage Required and Cost expense on storing information
Baseline measurement and date
19/05/18
Target performance and realisation dates
28/05/18
Risk potential to achieving this benefit
High
Risk mitigation
NA
Status update and date
30/05/18
Security of data
Benefit Title: Security of data
Unique Number:
0002
Benefit Owner:
Security Expert
Benefit Overview:
Securing the data from external access
Current business problems:
data theft and data manipulation
Solution:
Security Measures like Firewall, IDS/IPS must be implied
Enabling functionality
Security of the data stored enabling better performance
Change required
Business, Technology, Organisation, People and Process
Security techniques would be installed improving the safety of data
Impact on risk and cost
Reduce the probability of the risk like data theft and data manipulation
Restrict the expense/loss due to data theft
Business case variation
IIL would be able to execute their operations successfully without fear of data theft
How will this be measured, source of information and frequency
Security hindrances occurred in the system
Baseline measurement and date
12/05/18
Target performance and realisation dates
22/05/18
Risk potential to achieving this benefit
High
Risk mitigation
Firewall, IDS/IPS
Status update and date
27/05/18
Performance Increment
Benefit Title: Performance Increment
Unique Number:
0003
Benefit Owner:
Operation Manager
Benefit Overview:
Increase in the efficiency of the organization
Current business problems:
slower operations and delay in completion of sales operations
Solution:
Increasing the pace of operations by implying automation and decreasing the time used for data fetching
Enabling functionality
automation and decreasing the time used for data fetching
Change required
Business, Technology, Organisation, People and Process
Information System and Automatic Operations (billing, customer data, and stock management)
Impact on risk and cost
Reduce the probability of the risk like slower operations and delay in completion of sales operations
Cost lost due to delay in operations would be minimized
Business case variation
IIL would get the benefit of improved operations
How will this be measured, source of information and frequency
Time taken for the operations and number of customers
Baseline measurement and date
25/06/18
Target performance and realisation dates
30/06/18
Risk potential to achieving this benefit
Medium
Risk mitigation
NA
Status update and date
08/11/18
Realisation Plan
Integration of information
4.1.1 Activities
Data would be integrated on a single platform
Big Data Solution should be installed
1.2 Outcomes
Data Storage Required and Cost expense on storing information
4.1.3 Schedule
Start Date: 19/05/18
End Date: 28/05/18
4.1.4 Dependencies
Integrated Data Source
Security of data
4.2.1 Activities
Securing the data from external access
Security techniques would be installed improving the safety of data
4.2.2 Outcomes
Security hindrances occurred in the system
4.2.3 Schedule
Start Date: 12/05/18
End Date: 22/05/18
4.2.4 Dependencies
Security Measures like Firewall, IDS/IPS
Performance Increment
4.3.1 Activities
Increase in the efficiency of the organization
Information System and Automatic Operations (billing, customer data, and stock management)
4.3.2 Outcomes
Time taken for the operations and number of customers
4.3.3 Schedule
Start Date: 25/06/18
End Date: 30/06/18
4.3.4 Dependencies
Automation and decreasing the time used for data fetching
Value Governance
Value Governance Process
Manual Process for modifying the functions and aligning the system modification process and integration management can be aligned successfully.
Governance Changes
Automatic Management of the data would be required for easing the process
References
Binder, J., 2016. Global project management: communication, collaboration and management across borders. Routledge.
isaca.org., 2018. Building A Stronger Cybersecurity Workforce., CYBERSECURITY NEXUS™ (CSX). Available at: https://cybersecurity.isaca.org/csx-nexus
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Laudon, K.C. and Laudon, J.P., 2015. Management information systems (Vol. 8). Prentice Hall.
Marchewka, J.T., 2014. Information technology project management. John Wiley & Sons.
Sanchez, O.P. and Terlizzi, M.A., 2017. Cost and time project management success factors for information systems development projects. International Journal of Project Management, 35(8), pp.1608-1626.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Wager, K.A., Lee, F.W. and Glaser, J.P., 2017. Health care information systems: a practical approach for health care management. John Wiley & Sons.
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 6 pages
PAY 4 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2021). Web Page Design. Retrieved from https://myassignmenthelp.com/free-samples/isys631-web-page-design/information-technology-project-management.html.
“Web Page Design.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/isys631-web-page-design/information-technology-project-management.html.
My Assignment Help (2021) Web Page Design [Online]. Available from: https://myassignmenthelp.com/free-samples/isys631-web-page-design/information-technology-project-management.html[Accessed 18 December 2021].
My Assignment Help. ‘Web Page Design’ (My Assignment Help, 2021)
My Assignment Help. Web Page Design [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/isys631-web-page-design/information-technology-project-management.html.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
For years now, MyAssignmenthelp.com is providing affordable essay help to millions of students worldwide. Our essay assistance services have helped us in assisting students with even the toughest essay assignments. We take pride in the fact that we cater the best assistance to search terms like help me with my essay. We offer affordable services in the fastest way possible. For our fast delivering services, students trust us with their urgent essay assignment needs. Two of our most popular essay writing services are maths essay help and English essay help.
Latest Management Samples
div#loaddata .card img {max-width: 100%;
}
MPM755 Building Success In Commerce
Download :
0 | Pages :
9
Course Code: MPM755
University: Deakin University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More
SNM660 Evidence Based Practice
Download :
0 | Pages :
8
Course Code: SNM660
University: The University Of Sheffield
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration
BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20
Course Code: BSBHRM513
University: Tafe NSW
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More
MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5
Course Code: MKT2031
University: University Of Northampton
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration
MN506 System Management
Download :
0 | Pages :
7
Course Code: MN506
University: Melbourne Institute Of Technology
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…