Question? Call Us  +1 (817) 546-4770

ACCT5919 Business Risk Management

Academic Anxiety?

Get an original paper within hours and nail the task

156 experts online

Free Samples

ACCT5919 Business Risk Management

.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}

ACCT5919 Business Risk Management

0 Download7 Pages / 1,668 Words

Course Code: ACCT5919
University: University Of New South Wales

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Question:

Assessment of business risk:
1. Identify the existing risks and their ratings
2. Number of existing Extreme, High, Medium, and Low risks
3. What risks are targeted to be mitigated through the proposal
4. What will be the rating of risks post completion of the project
Links for project material:-
https://www.sa.gov.au/topics/planning-and-property/land-and-property-development/building-and-property-development-applications/major-development-applications-and-assessments/historical-listing-of-proposals-previously-assessed/desalination-plant-port-stanvac

Adelaide Desalination Plant, South Australia


https://www.escosa.sa.gov.au/ArticleDocuments/334/20160606-Water-SAWaterRegulatoryDetermination2016ConsultantReport-BlackAndVeatch.pdf.aspx?Embed=Y

Answer:

Introduction
Desalination is an important project, especially in South Adelaide, since it helps the people have access to potable water. The government of Adelaide, introduced the plant in order for the people to have access to 100 gigalitres (gl) of water every yea. The project was to be completed in 2011. However, there are some risks that are associated with the project, since it is of a large scale. The following report will aim to look at the risks, and classify them into Big, Medium or Low Risks. It will also look at the risks post the mitigation of the project and the rating of risk past the completion of the project.
Existing Risks and Ratings
There are many existing risks that have been associated with the project. The first is the environmental risks. When desalination is done to a large extent, then it would mean that the waste of the salination is dumped back into the ocean. This can impact the marine life to a large extent. This would be defined as a medium risk, since it would not be harmful to the people who benefit from the desalination plant. However, the plants would also kill millions of fish in the process of gathering the water for desalination (Tan-Kantor, Abbott and Jubb, 2017). This can dramatically affect the local fishermen, since their prospects and the methods of catching fish would need to be revaluated, which could turn out to be expensive and a loss to business. This would constitute a high risk, since the people would suffer, and local businesses might have to shut down as well.
The third risk would be the expense factor. Most desalination plants are extremely expensive to build. The current budget might seem enough to build a desalination plant; however, it might not be enough. This would also constitute a medium risk, since it would mean that the plant might not be built on time, or efficiently, due to cost-cutting techniques that would have to be taken into consideration as well.
A low risk would be the energy required to run the plant. Desalination plants require a lot of energy in order to run. This means that the energy has to be sourced from somewhere. If the energy is sourced from non-renewable sources, it would mean that the effect that the desalination plant has on the environment increases (Tuner, et al, 2017, p. S128). Desalination plants already emit a lot of greenhouse gases, and are thus, harmful to the climate as well. by using non-renewable energy, it would mean that the plant would further harm the climate and lead to global warming.
Another risk is that the public might not respond positively to the plant. The public might not like the fact that they are being forced to have seawater in their homes, which could cause public outcry. The public have to be adequately informed and their opinions, suggestions and doubts have to be taken into consideration as well (Sadgrove, 2016). This is a high risk, since not having public consensus on the plant would mean that the government would have to shut the project down, so as to not cause any issues of a large scale.
Another high risk would be the contractors who have been given the contract to build the plant. The contractors, if they are not of excellent repute, could cause a lot of damage to the plant as well. Corruption could destroy the plant, since it would mean that money would be skimmed off, which would lead to low quality of materials used (Kosovac, Hurlimann and Davidson, 2017). The people who would be running the plant, which would also include those who are in charge of mixing the appropriate chemicals to make it more potable, have also to be of high repute.
Number of Existing High, Medium and Low Risks
There are 2 medium risks, 3 high risks and 1 low risks. The impact that it has on fishermen, contractors that build the plant, and the reaction and inclusion of the public would be considered a high risk. The impact that it has on the environment, such as the dumping of the saline slurry in the after, and the expense would be a medium risk, since they could be solved to a large extent. The energy efficiency of the plant, and the type of energy-resource used would be a low risk, since it can be solved easily.
Risks targeted and mitigated through the proposal
There are many risks that have been targeted and mitigated through the proposal that has been sent by the government.
The first risk, that of environmental damage and the dumping of the waste, was solved by the government. In the proposal, the government stated that they would try to build the plant in a way that is sustainable. This would ensure that the waste is dumped in a responsible manner, in order to ensure that there is as little damage as possible. This step was essential in order to ensure that the risk is mitigated. In order to ensure that the risk of damage to the fishermen is mitigated, the project is set to be built in a way that the mechanism that swallows fish and plankton is minimised as much as possible (Ziolkowska, 2015). The government has also ensured that the fisherman have been advised to find alternative fish routes so that they are less affected by the plant. This mitigates the high risk that was posed by the salination plants to the livelihoods of the fishermen and the local business. The plant is also situated as far away from the regular fishing routes of the fishermen, which is why it creates very little damage to the fishermen.
The government has set aside a budget of $1.1 billion for the completion of the plant in the proposal that has been setup by the government. This has ensured that the plant is effective in the way that it functions. It also ensures that the plant is finished and everything is in order. The funding that is received from the government proposal is adequate enough that it ensures that there need not be cost-cutting, or the use of low-cost materials in order to complete the project as well (Yan, et al, 2016, p. 870).
The government proposal mentions that the salination plant would use the energy that is derived from renewable resources. Though the type of resources has not been mentioned, it would most likely be solar or tidal energy, since it would be easy to source solar energy. The energy could be taken from the Australian grid, which would mean that it would be energy sustainable in most ways. While the amount of greenhouse gases that are emitted from the desalination plant cannot be controlled to a large extent, ensuring that is uses renewable, green energy in order to run would be a good method to reduce their carbon footprint (Metzger, et al, 2016).
The government has also ensured that there are public meetings, and publications in the gazette that would inform the people about the plant and take their opinions into the plant as well. This would also ensure that the people are not as opposed to the plant as they generally would be.
The government has ensured that the contractors that build the place are of high repute. There is also regular assessment that is done by the proper authorities, in order to ensure that the contractors have been using the proper materials and sticking to the deadlines that have been committed. There will be formal guidelines and detailed assessment that is done by the government, in order to ensure that the plant is completed as per schedule.
Rating of Risks post completion
Post the completion of the project, the risks would be very low. While the risks to the fishermen would be medium, since to a large extent it cannot be mitigated in any way, the other risks would be at a minimum level. The risk of damage to the plant due to external factors would be high, but the risk of delayed completion, or the risk of emission of greenhouse gases, or energy consumption have been minimised to a large extent. Most of the risks are now low risks.
Conclusion
The salination plant at Adelaide has seen a lot of problems, and the risks that have been associated with the plant have been increasing. However, due to careful mitigation of the proposal, and after the completion of the project, the risks have been considered to be very low risks, since they have not done any damage to the plant. The local fishermen have had to change their fishing course, and the ecosystem of the sea has been changed somewhat, but to a large extent, the risks have remained minimal. This has been beneficial to the plant, and to the government. It has ensured that there is an adequate amount of potable water in Adelaide, which is beneficial to the people.
References
Kosovac, A., Hurlimann, A. and Davidson, B., 2017. Water experts’ perception of risk for new and unfamiliar water projects. Water, 9(12), p.976.
Metzger, E., Owens, B., Reig, P., Wen, W.H. and Young, R., 2016. Water-energy nexus: business risks and rewards. World Resources Institute.
Sadgrove, K., 2016. The complete guide to business risk management. Routledge.
Tan?Kantor, A., Abbott, M. and Jubb, C., 2017. Accounting Choice and Theory in Crisis: The Case of the Victorian Desalination Plant. Australian Accounting Review, 27(3), pp.273-284.
Turner, A., Sahin, O., Giurco, D., Stewart, R. and Porter, M., 2017. Reprint of: The potential role of desalination in managing flood risks from dam overflows: the case of Sydney, Australia. Journal of Cleaner Production, 163, pp.S125-S137.
Yan, H.M., Cao, C.Y., Bai, G. and Bai, W., 2016, April. Seawater Desalination Technology Route and Analysis of Production Capacity for Large Commercial Nuclear Power Plant. In International Confernece Pacific Basin Nuclear Conference. pp. 865-872. Springer, Singapore.
Ziolkowska, J.R., 2015. Is desalination affordable?—regional cost and price analysis. Water resources management, 29(5), pp.1385-1397.

Free Membership to World’s Largest Sample Bank

To View this & another 50000+ free samples. Please put
your valid email id.

E-mail

Yes, alert me for offers and important updates

Submit 

Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

UploadUnique Document

DocumentUnder Evaluation

Get Moneyinto Your Wallet

Total 7 pages

PAY 5 USD TO DOWNLOAD

*The content must not be available online or in our existing Database to qualify as
unique.

Cite This Work
To export a reference to this article please select a referencing stye below:

APA
MLA
Harvard
OSCOLA
Vancouver

My Assignment Help. (2021). Business Risk Management. Retrieved from https://myassignmenthelp.com/free-samples/acct5919-business-risk-management/a-report-on-big-medium-or-low-risks-in-business.html.

“Business Risk Management.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/acct5919-business-risk-management/a-report-on-big-medium-or-low-risks-in-business.html.

My Assignment Help (2021) Business Risk Management [Online]. Available from: https://myassignmenthelp.com/free-samples/acct5919-business-risk-management/a-report-on-big-medium-or-low-risks-in-business.html[Accessed 18 December 2021].

My Assignment Help. ‘Business Risk Management’ (My Assignment Help, 2021) accessed 18 December 2021.

My Assignment Help. Business Risk Management [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/acct5919-business-risk-management/a-report-on-big-medium-or-low-risks-in-business.html.

×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}

×

Thank you for your interest
The respective sample has been mail to your register email id

×

CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.

Account created successfully!
We have sent login details on your registered email.

User:

Password:

With time, MyAssignmenthelp.com has become one of the best college essay writing services. Our all rounded services give students the confidence to overcome assignment related issues. Our services are fast enough to meet most urgent deadlines. We are capable of delivering fast essay writing services with the help of our specially designed provisions and writers’ teams. Our urgent essay help services guarantee most rapid delivery of assignment solutions. Some of our most popular essay services are application essay help, exploratory essay help, literary review essay help and argumentative essay help.

Latest Management Samples

div#loaddata .card img {max-width: 100%;
}

MPM755 Building Success In Commerce
Download :
0 | Pages :
9

Course Code: MPM755
University: Deakin University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More

SNM660 Evidence Based Practice
Download :
0 | Pages :
8

Course Code: SNM660
University: The University Of Sheffield

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration 

BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20

Course Code: BSBHRM513
University: Tafe NSW

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More

MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5

Course Code: MKT2031
University: University Of Northampton

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration 

MN506 System Management
Download :
0 | Pages :
7

Course Code: MN506
University: Melbourne Institute Of Technology

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…
Read
More
Tags:
Australia Cheltenham Computer Science Litigation and Dispute Management University of New South Wales Information Technology 

Next

Need an essay written specifically to meet your requirements?

Choose skilled experts on your subject and get an original paper within your deadline

156 experts online

Your time is important. Let us write you an essay from scratch

Tips and Tricks from our Blog

PROJ6016 Employer Based Project

Free Samples PROJ6016 Employer Based Project .cms-body-content table{width:100%!important;} #subhidecontent{ position: relative; overflow-x: auto; width: 100%;} PROJ6016 Employer

Read More »

PPMP20009 Marking Rubric

Free Samples PPMP20009 Marking Rubric .cms-body-content table{width:100%!important;} #subhidecontent{ position: relative; overflow-x: auto; width: 100%;} PPMP20009 Marking Rubric

Read More »